Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp220.28159.60144.63252.8069.60206.43352.51418.35498.87453.25175.97115.961053.342014.913068.25
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.0075.63176.510.000.000.00166.30377.00375.89289.900.000.00252.141209.091461.23
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.004.080.00108.170.000.000.000.0071.1911.320.000.00112.2582.51194.76
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)220.28155.52144.63144.6369.60206.43352.51418.35427.68441.94175.97115.96941.091932.412873.50
Available water for irrigated landK_irr=W_irr/WN_irr1.000.550.001.001.001.000.500.400.540.571.001.004.554.018.56
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.0075.63131.520.000.000.00166.30377.00375.89289.900.000.00207.151209.091416.24
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)32.2048.780.0097.992.7459.0788.17130.54225.96202.2458.050.45240.78705.41946.19
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)61.9293.800.00188.455.26113.60169.56251.04434.53388.92111.630.86463.031356.541819.57
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth61.9293.80-45.00188.455.26113.60169.56251.04434.53388.92111.630.86418.031356.541774.57
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00