Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp0.000.000.00114.572.42268.2990.77150.66299.28464.67352.6117.54385.281375.531760.81
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.000.000.00201.18198.31782.61466.36659.68713.40350.650.000.001182.102190.093372.19
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)0.000.000.00114.572.42268.2990.77150.66299.28464.67352.6117.54385.281375.531760.81
Available water for irrigated landK_irr=W_irr/WN_irr0.000.000.000.000.000.000.150.170.290.561.001.000.003.173.17
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.000.000.000.000.00271.84466.36659.68713.40350.650.000.00271.842190.092461.93
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)0.000.000.000.000.000.0036.4263.76131.79207.53156.202.900.00598.60598.60
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)0.000.000.000.000.000.0079.50139.17287.68452.99340.966.330.001306.631306.63
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth0.000.000.00107.12-5.11260.4179.50139.17287.68452.99340.966.33362.421306.631669.05
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr0.000.000.0099.9766.72145.4091.79109.47153.47202.46169.2670.11312.09796.561108.65
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E0.000.000.00105.0971.88150.7699.14116.95161.02210.05176.8377.42327.73841.411169.14
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.000.000.005.115.165.367.357.487.547.597.577.3115.6344.8460.47
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was0.000.000.00105.0971.88150.7699.14116.95161.02210.05176.8377.42327.73841.411169.14
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00