Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp21.5113.9927.0519.9113.3336.3363.9181.6384.6788.3085.4369.07132.12473.01605.13
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.000.000.000.000.000.00296.41461.27701.99730.41565.85205.140.002961.072961.07
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)21.5113.9927.0519.9113.3336.3363.9181.6384.6788.3085.4369.07132.12473.01605.13
Available water for irrigated landK_irr=W_irr/WN_irr1.000.000.000.000.001.000.110.000.090.090.100.212.000.602.60
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.000.000.000.000.000.00296.41441.09701.99730.41565.85205.140.002940.892940.89
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)4.050.000.000.000.006.8121.270.0040.1441.7636.0131.4210.86170.60181.46
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)7.000.000.000.000.0011.7836.790.0069.4272.2362.2954.3418.78295.07313.85
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth7.000.000.000.000.0011.7836.79-20.1869.4272.2362.2954.3418.78274.89293.67
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr1.911.351.351.351.352.306.690.3910.3010.619.518.639.6146.1355.74
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E2.772.182.852.482.153.678.195.7311.1911.5410.819.5016.1056.9673.06
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.860.831.501.140.801.371.515.340.900.941.300.876.5010.8617.36
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was2.772.182.852.482.153.678.195.7311.1911.5410.819.5016.1056.9673.06
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00