Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp68.3025.4927.0519.9113.3378.26291.71612.24635.04662.22626.49226.72232.343054.423286.76
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.000.000.000.000.000.000.0032.27174.16180.990.000.000.00387.42387.42
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)68.3025.4927.0519.9113.3378.26291.71612.24635.04662.22626.49226.72232.343054.423286.76
Available water for irrigated landK_irr=W_irr/WN_irr1.001.000.000.000.001.001.000.940.780.781.001.003.005.508.50
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.000.000.000.000.000.000.0032.27174.16180.990.000.000.00387.42387.42
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)31.096.650.000.000.0031.06152.96295.09358.32373.56348.81122.5668.801651.301720.10
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)53.7811.510.000.000.0053.72264.59510.43619.79646.15603.34212.00119.012856.302975.31
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth53.7811.510.000.000.0053.72264.59510.43619.79646.15603.34212.00119.012856.302975.31
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr5.672.271.351.351.355.6731.8659.0371.1174.0269.2926.0517.66331.36349.02
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E6.533.112.852.482.157.0433.3764.3672.0174.9670.5926.9224.16342.21366.37
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.860.831.501.140.801.371.515.340.900.941.300.876.5010.8617.36
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was6.533.112.852.482.157.0433.3764.3672.0174.9670.5926.9224.16342.21366.37
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00