Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp200.9840.9727.0519.9113.3337.09230.32556.59635.04662.22640.76324.53339.333049.463388.79
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.000.000.000.000.000.000.000.00111.93156.3656.690.000.00324.98324.98
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)200.9840.9727.0519.9113.3337.09230.32556.59635.04662.22640.76324.53339.333049.463388.79
Available water for irrigated landK_irr=W_irr/WN_irr1.001.000.000.000.001.001.001.000.850.810.921.003.005.588.58
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.000.000.000.000.000.000.000.00111.93156.3656.690.000.00324.98324.98
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)107.8015.600.000.000.007.25117.47262.92358.32373.56357.05179.11130.651648.431779.08
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)186.4726.990.000.000.0012.55203.19454.78619.79646.15617.61309.81226.012851.333077.34
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth186.4726.990.000.000.0012.55203.19454.78619.79646.15617.61309.81226.012851.333077.34
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr16.343.521.351.351.352.3625.0852.8871.1174.0270.8736.8626.27330.82357.09
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E17.204.352.852.482.153.7326.5858.2172.0174.9672.1737.7332.76341.66374.42
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.860.831.501.140.801.371.515.340.900.941.300.876.5010.8617.36
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was17.204.352.852.482.153.7326.5858.2172.0174.9672.1737.7332.76341.66374.42
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00