Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp214.68159.60144.63178.6871.12194.05352.51418.35498.87453.25233.53115.79962.762072.303035.06
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.00114.87238.100.000.000.00153.42330.10681.73373.160.000.00352.971538.411891.38
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.004.080.0034.050.000.000.000.0071.1911.320.000.0038.1382.51120.64
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)214.68155.52144.63144.6371.12194.05352.51418.35427.68441.94233.53115.79924.631989.802914.43
Available water for irrigated landK_irr=W_irr/WN_irr1.000.450.001.001.001.000.520.430.390.511.001.004.453.858.30
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.00114.87193.110.000.000.00153.42330.10681.73373.160.000.00307.981538.411846.39
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)29.2848.780.0059.453.5352.6488.17130.54225.96202.2487.980.36193.68735.25928.93
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)56.3293.800.00114.336.78101.23169.56251.04434.53388.92169.190.69372.461413.931786.39
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth56.3293.80-45.00114.336.78101.23169.56251.04434.53388.92169.190.69327.461413.931741.39
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00