Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp120.1850.5432.200.000.000.000.000.000.000.000.000.00202.920.00202.92
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)120.1850.5432.200.000.000.000.000.000.000.000.000.00202.920.00202.92
Available water for irrigated landK_irr=W_irr/WN_irr1.000.000.000.000.000.000.000.000.000.000.000.001.000.001.00
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)25.020.000.000.000.000.000.000.000.000.000.000.0025.020.0025.02
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)54.610.000.000.000.000.000.000.000.000.000.000.0054.610.0054.61
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth54.610.000.000.000.000.000.000.000.000.000.000.0054.610.0054.61
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr60.5153.7153.7153.7153.7153.7174.5874.5874.5874.5874.5874.58329.06447.48776.54
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E105.9788.7676.0853.7953.7953.7974.6674.6674.6674.6674.6674.66432.18447.96880.14
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was45.4635.0622.370.080.080.080.080.080.080.080.080.08103.130.48103.61
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was105.9788.7676.0853.7953.7953.7974.6674.6674.6674.6674.6674.66432.18447.96880.14
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00