Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp220.84159.60144.63203.4388.95221.04352.51418.35498.87453.25431.15117.791038.492271.923310.41
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)5.05112.31314.140.000.000.0078.54410.68933.65572.940.000.00431.501995.812427.31
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.004.080.0058.800.000.000.000.0071.1911.3221.840.0062.88104.35167.23
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)220.84155.52144.63144.6388.95221.04352.51418.35427.68441.94409.30117.79975.612167.573143.18
Available water for irrigated landK_irr=W_irr/WN_irr0.930.460.001.001.001.000.680.380.320.401.001.004.393.788.17
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)5.05112.31269.140.000.000.0078.54410.68933.65572.940.000.00386.501995.812382.31
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)32.4948.780.0072.3212.8066.6788.17130.54225.96202.24190.741.40233.06839.051072.11
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)62.4793.800.00139.0824.61128.21169.56251.04434.53388.92366.812.69448.171613.552061.72
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth62.4793.80-45.00139.0824.61128.21169.56251.04434.53388.92366.812.69403.171613.552016.72
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00