Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp158.36114.54144.63168.4871.39133.07323.54418.35498.87453.25353.92115.94790.472163.872954.34
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.000.00252.520.000.000.000.00221.25515.79448.400.000.00252.521185.441437.96
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.000.000.0023.840.000.000.000.0071.1911.320.000.0023.8482.51106.35
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)158.36114.54144.63144.6371.39133.07323.54418.35427.68441.94353.92115.94766.622081.372847.99
Available water for irrigated landK_irr=W_irr/WN_irr0.001.000.001.001.001.001.000.530.460.461.001.004.004.458.45
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.000.00207.520.000.000.000.00221.25515.79448.400.000.00207.521185.441392.96
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)0.0025.350.0054.153.6720.9373.11130.54225.96202.24150.580.44104.10782.87886.97
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)0.0048.740.00104.137.0540.25140.59251.04434.53388.92289.580.84200.171505.501705.67
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth0.0048.74-45.00104.137.0540.25140.59251.04434.53388.92289.580.84155.171505.501660.67
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00