Select planning zone




Total 18 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Total water withdrawalMm3/monthW=W_tr+W_loc+WP_gr+WP_rp158.36159.60144.63176.9664.34170.15352.51418.35498.87453.25451.64139.00874.042313.623187.66
Water deficitMm3/monthD=IF(WN-W>=0,WN-W,0)0.0044.63100.560.000.000.00115.6982.44710.22650.71195.120.00145.191754.181899.37
Water excessMm3/monthE=IF(W-WN>=0,W-WN,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water withdrawal from local sourcesMm3/monthW_loc=IF(WP_loc<=WN-WP_gr-WP_rp+V_r-W_tr,WP_loc,WN-WP_gr-WP_rp+V_r-W_tr)0.004.080.0032.320.000.000.000.0071.1911.3242.340.0036.40124.85161.25
Water withdrawal from transboundary sourcesMm3/monthW_tr=IF(WP_tr<=WN-WP_gr-WP_rp+V_r,WP_tr,WN-WP_gr-WP_rp+V_r)158.36155.52144.63144.6364.34170.15352.51418.35427.68441.94409.30139.00837.632188.783026.41
Available water for irrigated landK_irr=W_irr/WN_irr0.000.680.001.000.001.000.590.750.380.370.661.002.683.756.43
Irrigation water deficitMm3/monthD_irr=IF(WN_irr-W_irr>=0,WN_irr-W_irr,0)0.0044.6355.560.000.000.00115.6982.44710.22650.71195.120.00100.191754.181854.37
Irrigation water lossesMm3/monthLO_irr=W_irr*(1-n)0.0048.780.0058.560.0040.2188.17130.54225.96202.24201.4012.43147.55860.741008.29
Irrigation water withdrawal, excluding leachingMm3/monthW_irr=IF(W_irrflu-WN_flu>0,W_irrflu-WN_flu,0)0.0093.800.00112.610.0077.33169.56251.04434.53388.92387.3123.91283.741655.271939.01
Irrigation water withdrawal, including leachingMm3/monthW_irrflu=W-WN_ind-WN_dom-WN_oth0.0093.80-45.00112.610.0077.33169.56251.04434.53388.92387.3123.91238.741655.271894.01
Amount of drainage water generated from irrigation water useMm3/monthW_dr=W_irrflu*a_dr+W_irrflu*b_dr+c_dr0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return waterMm3/monthW_ret=W_drwas+W_h+E0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of wastewater from non-irrigation water useMm3/monthW_was=a_was*(WN_ind+WN_dom+WN_oth)+b_was0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Idle discharge from local water sourcesMm3/monthW_h=IF(WR_loc-W_loc>=0,WR_loc-W_loc,0)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total amount of drainage water and wastewaterMm3/monthW_drwas=W_dr+W_was0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into lakes and depressionsMm3/monthW_drl=K_drl*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water discharged into riversMm3/monthW_drtr=K_drtr*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of return water flowing to neighboring PZsMm3/monthW_drto=K_drto*(W_ret+W_drfrom-WP_rp)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00