To the beginning of the section
Off-grid Renewable Energy Statistics 2025
Off-grid Renewable Energy Statistics 2024
World Bank, 2012-2014
Techno-Economic Assessment Study (TEAS), Phase II: Executive Summary
Techno-Economic Assessment Study (TEAS), Phase II: Summary
Techno-Economic Assessment Study (TEAS), Phase II: Design Criteria
Techno-Economic Assessment Study (TEAS), Phase II: Reservoir Operation
Techno-Economic Assessment Study (TEAS), Phase II: Reservoir Operation (Annexes)
Environmental and Social Impact Assessment (ESIA), Volume I: Text
Environmental and Social Impact Assessment (ESIA), Volume II: Annexes
Final Report of the Engineering and Dam Safety Panel of Experts
Final Report of the Environmental and Social Panel of Experts
Report on the 5th Riparian Information-Sharing and Consultation Process
Key Issues for Consideration on the Proposed Rogun Hydropower Project
World Bank, 2024-2025
Rogun Hydropower Project. Updated Environmental and Social Impact Assessment. Volume 1: ESIA
Rogun Hydropower Project. Updated Environmental and Social Impact Assessment. Volume 2: Annexes
Resettlement Action Plan – Phase 2, 2017-2026 for Rogun Hydropower Project
Rogun Alert Coalition