Select planning zone




Total 31 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Efficiency of inter-farm networkn1=0.790.790.790.790.790.790.790.790.790.790.790.794.744.749.48
Efficiency of on-farm networkn2=0.790.790.790.790.790.790.790.790.790.790.790.794.744.749.48
Leached land/Irrigated areaK_flu=0.720.720.720.720.720.720.720.720.720.720.720.724.324.328.64
Public water supply withdrawalMm3/monthWN_dom=0.691.862.001.813.083.113.383.183.283.364.003.6712.5520.8733.42
Water depth for leaching of irrigated landmm/monthWL_flu=0.000.00124.43124.43124.43124.430.000.000.000.000.000.00497.720.00497.72
Water withdrawal for industryMm3/monthWN_ind=3.7910.3011.709.7617.9917.2723.2222.2222.2022.8923.5023.5170.81137.54208.35
Water withdrawal for other purposesMm3/monthWN_oth=0.050.100.060.080.490.500.530.620.820.980.880.301.284.135.41
Limit for water withdrawal from local sourcesMm3/monthWLI_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Limit for water withdrawal from transboundary sourcesK_tr=0.750.750.750.750.750.750.750.750.750.750.750.754.504.509.00
Limit for water withdrawal from transboundary sourcesMm3/monthWLI_tr=44.93182.30173.230.00182.63411.93326.59611.06898.561444.051253.02461.74995.024995.025990.04
Amount of collector-drainage water re-use/Irrigation water withdrawal, excluding leachingK_rp=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Maximum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmax=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Minimum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmin=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from groundwaterMm3/monthWP_gr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from local sourcesMm3/monthWP_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from transboundary sourcesMm3/monthWP_tr=38.70101.09217.94139.60224.85231.83286.22318.12466.471056.111120.32515.46954.013762.704716.71
Maximum water volume in reservoirsMm3/monthV_max=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Minimum water volume in reservoirsMm3/monthV_min=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water losses in reservoirsMm3/monthV_los=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month endMm3/monthV_end=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month startMm3/monthV_beg=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing from neighboring PZsMm3/monthW_drfrom=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdraa_dr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdrab_dr=0.150.150.150.150.150.150.080.080.080.080.080.080.900.481.38
Coefficients of functional relationship between drainage water quantity and irrigation water withdrac_dr=14.7014.7014.7014.7014.7014.7058.9258.9258.9258.9258.9258.9288.20353.52441.72
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdraa_was=0.310.310.310.310.310.310.310.310.310.310.310.311.861.863.72
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdrab_was=27.3327.3327.3327.3327.3327.3327.3327.3327.3327.3327.3327.33163.98163.98327.96
Local water sources formed in PZ or used in PZMm3/monthWR_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water discharged into lakes and depressions of PZ/Total return flowK_drl=1.481.292.411.221.010.580.640.460.250.320.530.607.992.8010.79
Amount of collector-drainage water discharged into rivers/Total return flowMm3/monthK_drtr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing to neighboring PZs/Total return flowK_drto=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00