Select planning zone




Total 31 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Efficiency of inter-farm networkn1=0.790.790.790.790.790.790.790.790.790.790.790.794.744.749.48
Efficiency of on-farm networkn2=0.790.790.790.790.790.790.790.790.790.790.790.794.744.749.48
Leached land/Irrigated areaK_flu=0.720.720.720.720.720.720.720.720.720.720.720.724.324.328.64
Public water supply withdrawalMm3/monthWN_dom=3.610.0818.737.450.041.972.013.794.324.635.231.5231.8821.5053.38
Water depth for leaching of irrigated landmm/monthWL_flu=0.000.00124.43124.43124.43124.430.000.000.000.000.000.00497.720.00497.72
Water withdrawal for industryMm3/monthWN_ind=22.610.44127.7941.200.2411.1214.0726.6229.7732.0531.019.86203.40143.38346.78
Water withdrawal for other purposesMm3/monthWN_oth=0.310.000.610.250.010.340.320.731.091.351.150.151.524.796.31
Limit for water withdrawal from local sourcesMm3/monthWLI_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Limit for water withdrawal from transboundary sourcesK_tr=0.750.750.750.750.750.750.750.750.750.750.750.754.504.509.00
Limit for water withdrawal from transboundary sourcesMm3/monthWLI_tr=2.6883.81331.340.00191.38350.79327.46610.20898.991445.861253.02459.43960.004994.965954.96
Amount of collector-drainage water re-use/Irrigation water withdrawal, excluding leachingK_rp=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Maximum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmax=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Minimum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmin=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from groundwaterMm3/monthWP_gr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from local sourcesMm3/monthWP_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from transboundary sourcesMm3/monthWP_tr=235.682.85454.52150.531.00244.55262.93719.061001.251246.831312.87421.011089.134963.956053.08
Maximum water volume in reservoirsMm3/monthV_max=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Minimum water volume in reservoirsMm3/monthV_min=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water losses in reservoirsMm3/monthV_los=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month endMm3/monthV_end=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month startMm3/monthV_beg=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing from neighboring PZsMm3/monthW_drfrom=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdraa_dr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdrab_dr=0.150.150.150.150.150.150.080.080.080.080.080.080.900.481.38
Coefficients of functional relationship between drainage water quantity and irrigation water withdrac_dr=14.7014.7014.7014.7014.7014.7058.9258.9258.9258.9258.9258.9288.20353.52441.72
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdraa_was=0.310.310.310.310.310.310.310.310.310.310.310.311.861.863.72
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdrab_was=27.3327.3327.3327.3327.3327.3327.3327.3327.3327.3327.3327.33163.98163.98327.96
Local water sources formed in PZ or used in PZMm3/monthWR_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water discharged into lakes and depressions of PZ/Total return flowK_drl=0.670.390.640.860.280.480.630.570.871.241.191.363.325.869.18
Amount of collector-drainage water discharged into rivers/Total return flowMm3/monthK_drtr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing to neighboring PZs/Total return flowK_drto=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00