Select planning zone




Total 31 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Efficiency of inter-farm networkn1=0.820.820.820.820.820.820.820.820.820.820.820.824.924.929.84
Efficiency of on-farm networkn2=0.820.820.820.820.820.820.820.820.820.820.820.824.924.929.84
Leached land/Irrigated areaK_flu=0.550.550.550.550.550.550.550.550.550.550.550.553.303.306.60
Public water supply withdrawalMm3/monthWN_dom=6.100.538.120.000.000.000.000.000.000.000.000.0014.750.0014.75
Water depth for leaching of irrigated landmm/monthWL_flu=0.000.00123.45129.20129.20129.200.000.000.000.000.000.00511.050.00511.05
Water withdrawal for industryMm3/monthWN_ind=0.210.020.300.000.000.000.000.000.000.000.000.000.530.000.53
Water withdrawal for other purposesMm3/monthWN_oth=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Limit for water withdrawal from local sourcesMm3/monthWLI_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Limit for water withdrawal from transboundary sourcesK_tr=0.600.600.600.600.600.600.600.600.600.600.600.603.603.607.20
Limit for water withdrawal from transboundary sourcesMm3/monthWLI_tr=292.030.00134.780.00229.48578.71331.21450.05677.03975.89743.26472.561235.003650.004885.00
Amount of collector-drainage water re-use/Irrigation water withdrawal, excluding leachingK_rp=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Maximum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmax=0.000.000.000.000.000.0050.2567.28107.03145.77112.2368.370.00550.93550.93
Minimum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmin=0.000.000.000.000.000.0010.0513.4621.4129.1522.4513.670.00110.19110.19
Potential water withdrawal from groundwaterMm3/monthWP_gr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from local sourcesMm3/monthWP_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from transboundary sourcesMm3/monthWP_tr=231.6810.00155.2087.0288.54604.99334.98448.55713.53971.81748.19455.781177.433672.844850.27
Maximum water volume in reservoirsMm3/monthV_max=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Minimum water volume in reservoirsMm3/monthV_min=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water losses in reservoirsMm3/monthV_los=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month endMm3/monthV_end=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month startMm3/monthV_beg=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing from neighboring PZsMm3/monthW_drfrom=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdraa_dr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdrab_dr=0.360.360.360.360.360.360.310.310.310.310.310.312.161.864.02
Coefficients of functional relationship between drainage water quantity and irrigation water withdrac_dr=98.2098.2098.2098.2098.2098.20134.90134.90134.90134.90134.90134.90589.20809.401398.60
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdraa_was=0.450.450.450.450.450.450.450.450.450.450.450.452.702.705.40
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdrab_was=1.581.581.581.581.581.581.581.581.581.581.581.589.489.4818.96
Local water sources formed in PZ or used in PZMm3/monthWR_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water discharged into lakes and depressions of PZ/Total return flowK_drl=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water discharged into rivers/Total return flowMm3/monthK_drtr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing to neighboring PZs/Total return flowK_drto=0.050.060.180.000.000.000.000.000.000.000.000.000.290.000.29