Select planning zone




Total 31 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Efficiency of inter-farm networkn1=0.850.850.850.850.850.850.850.850.850.850.850.855.105.1010.20
Efficiency of on-farm networkn2=0.850.850.850.850.850.850.850.850.850.850.850.855.105.1010.20
Leached land/Irrigated areaK_flu=0.860.860.860.660.660.660.660.660.660.660.660.664.563.968.52
Public water supply withdrawalMm3/monthWN_dom=1.261.211.010.971.011.071.231.311.351.351.651.316.538.2014.73
Water depth for leaching of irrigated landmm/monthWL_flu=0.000.00172.6074.4746.67186.270.000.000.000.000.000.00480.010.00480.01
Water withdrawal for industryMm3/monthWN_ind=7.857.716.776.306.266.509.459.899.759.759.487.8241.3956.1497.53
Water withdrawal for other purposesMm3/monthWN_oth=0.110.060.030.010.070.170.180.250.320.380.340.130.451.602.05
Limit for water withdrawal from local sourcesMm3/monthWLI_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Limit for water withdrawal from transboundary sourcesK_tr=0.750.750.750.750.750.750.750.750.750.750.750.754.504.509.00
Limit for water withdrawal from transboundary sourcesMm3/monthWLI_tr=279.62163.73147.48388.70303.13262.30348.62458.35598.75737.08593.40298.811544.963035.014579.97
Amount of collector-drainage water re-use/Irrigation water withdrawal, excluding leachingK_rp=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Maximum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmax=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Minimum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmin=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from groundwaterMm3/monthWP_gr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from local sourcesMm3/monthWP_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from transboundary sourcesMm3/monthWP_tr=92.8774.78188.9038.1928.99175.5275.06129.97152.26296.04286.97127.44599.251067.741666.99
Maximum water volume in reservoirsMm3/monthV_max=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Minimum water volume in reservoirsMm3/monthV_min=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water losses in reservoirsMm3/monthV_los=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month endMm3/monthV_end=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month startMm3/monthV_beg=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing from neighboring PZsMm3/monthW_drfrom=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdraa_dr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdrab_dr=0.300.300.300.300.300.300.300.300.300.300.300.301.801.803.60
Coefficients of functional relationship between drainage water quantity and irrigation water withdrac_dr=68.2468.2468.2468.2468.2468.2468.2468.2468.2468.2468.2468.24409.44409.44818.88
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdraa_was=0.580.580.580.580.580.580.580.580.580.580.580.583.483.486.96
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdrab_was=0.760.760.760.760.760.760.760.760.760.760.760.764.564.569.12
Local water sources formed in PZ or used in PZMm3/monthWR_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water discharged into lakes and depressions of PZ/Total return flowK_drl=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water discharged into rivers/Total return flowMm3/monthK_drtr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing to neighboring PZs/Total return flowK_drto=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00