Select planning zone




Total 31 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Efficiency of inter-farm networkn1=0.820.820.820.820.820.820.820.820.820.820.820.824.924.929.84
Efficiency of on-farm networkn2=0.820.820.820.820.820.820.820.820.820.820.820.824.924.929.84
Leached land/Irrigated areaK_flu=0.550.550.550.550.550.550.550.550.550.550.550.553.303.306.60
Public water supply withdrawalMm3/monthWN_dom=2.878.117.572.632.2910.586.267.918.1712.3210.265.1534.0550.0784.12
Water depth for leaching of irrigated landmm/monthWL_flu=0.000.00132.45123.45123.45123.450.000.000.000.000.000.00502.800.00502.80
Water withdrawal for industryMm3/monthWN_ind=0.120.410.390.080.070.300.140.250.260.410.350.171.371.582.95
Water withdrawal for other purposesMm3/monthWN_oth=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Limit for water withdrawal from local sourcesMm3/monthWLI_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Limit for water withdrawal from transboundary sourcesK_tr=0.750.750.750.750.750.750.750.750.750.750.750.754.504.509.00
Limit for water withdrawal from transboundary sourcesMm3/monthWLI_tr=231.120.00161.570.00235.70606.63319.68438.91596.16910.66752.68431.891235.023449.984685.00
Amount of collector-drainage water re-use/Irrigation water withdrawal, excluding leachingK_rp=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Maximum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmax=0.000.000.000.000.000.0038.2950.1267.50135.23122.1760.770.00474.08474.08
Minimum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmin=0.000.000.000.000.000.007.6610.0213.5027.0524.4312.150.0094.8194.81
Potential water withdrawal from groundwaterMm3/monthWP_gr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from local sourcesMm3/monthWP_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from transboundary sourcesMm3/monthWP_tr=173.340.00121.180.00176.77454.97239.76329.18447.12682.99564.51323.92926.262587.483513.74
Maximum water volume in reservoirsMm3/monthV_max=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Minimum water volume in reservoirsMm3/monthV_min=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water losses in reservoirsMm3/monthV_los=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month endMm3/monthV_end=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month startMm3/monthV_beg=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing from neighboring PZsMm3/monthW_drfrom=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdraa_dr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdrab_dr=0.360.360.360.360.360.360.310.310.310.310.310.312.161.864.02
Coefficients of functional relationship between drainage water quantity and irrigation water withdrac_dr=98.2098.2098.2098.2098.2098.20134.90134.90134.90134.90134.90134.90589.20809.401398.60
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdraa_was=0.450.450.450.450.450.450.450.450.450.450.450.452.702.705.40
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdrab_was=1.581.581.581.581.581.581.581.581.581.581.581.589.489.4818.96
Local water sources formed in PZ or used in PZMm3/monthWR_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water discharged into lakes and depressions of PZ/Total return flowK_drl=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water discharged into rivers/Total return flowMm3/monthK_drtr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing to neighboring PZs/Total return flowK_drto=0.050.050.370.150.040.140.070.050.040.090.100.100.800.451.25