Название практики Improving the reclamation condition of land along the Darialyk Collector Безопасное и комплексное использование гидротехнических сооружений. Автоматизированная система управления Актюбинским водохранилищем
Category Water resources Water resources
Tool Collector-drainage system Monitoring system

Other: Безопасность и автоматизация гидротехнических сооружений

Field of application
  • Use of water resources
  • Use of land resources
  • Environmental protection

Использование водных ресурсов, ГТС

Usability of practice for adaptation to climate change Low High
Implemented by State Program
Практика внедрена в 2017 г. в рамках совместного проекта ЕС/ПРООН/ЕЭК ООН «Поддержка Казахстана для перехода к модели зеленой экономики».
Used by

Country: Turkmenistan

Province: Daşoguz Region

Country: Kazakhstan

Province: Aktobe Region

District: Kargaly District

Other settlement: Актобе

Local specifics

Lower reaches of the Amu Darya River Basin

Количество и влияние бедствий, в том числе вызванных воздействием природных и техногенных факторов, растёт из года в год. В период с 2005 по 2015 гг., жертвами таких бедствий стали свыше 700 000 человек и порядка 23 миллионов человек остались без крова. Общий экономический ущерб составил более 1,3 трлн. долларов США. В Казахстане по данным ЧС только в 2017 году в результате чрезвычайных ситуаций как техногенного, так и природного характера погибло более тысячи человек, порядка четырех тысяч человек пострадали. Сильные весенние паводки бушевали в семи областях Казахстана. Прорыв дамбы в городе Атбасар Акмолинской области привел к эвакуации тысячи людей, сотни домов были подтоплены. Многих мало- и среднемасштабных бедствий можно было бы избежать, а их воздействия смягчить, с помощью систематического применения стратегий и практик снижения риска бедствий, особенно если содействовать им на местном уровне. По данным международных экспертов, на каждый доллар, потраченный на снижение риска бедствий, с точки зрения предотвращения ущерба и затрат, возвращаются порядка четырех долларов США.

Practice usage period

Start date: 01.01.2009

End date: 31.12.2015

Start date: 01.11.2017

End date: 30.11.2018

Problem solved through this practice

Expanding salination of irrigated land

Данная практика обеспечивает безопасное и комплексное использование гидротехнических сооружений на примере Актюбинского водохранилища посредством автоматизации системы мониторинга и оповещения водохранилища. Актюбинское водохранилище с объемом 245 млн.м3 является потенциально опасным водным объектом15, в случае разрушения плотины в зону затопления попадают не менее 25% площади г.Актобе, дачные участки в долине реки и другие сельскохозяйственные и промышленные объекты, близкорасположенные к водохранилищу. Именно поэтому, Проектом было предусмотрено оборудование водохранилища автоматической системой опове щения «СПРУТ-ИНФОРМ», которая позволяет в режиме реального времени отслеживать состояние оповещения, вести подробную статистику, которая в дальнейшем может быть проанализирована администратором для более точной и правильной настройки системы.

Tools used in the practice

Set of measures to enhance the reclamation condition of land (motorized cleaning of the collector, reconstruction of hydro-technical facilities, etc.).

Автоматизация процесса сбора информации от первичных датчиков и устройств, их обработки и анализа, передачи полученных результатов на пульты диспетчерской связи и в ответственные органы для выработки и принятия соответствующих решений, а также процесс передачи сигналов предупреждений и тревоги в случае превышения заданных пределов.

Description of the practice and its results

Actions:

A set of measures to rehabilitate the Darialyk Collector executed to improve land reclamation condition.

Results:

The executed actions allowed lowering the level of ground water occurrence, thus, enhancing the overall land reclamation condition in target area as well as improving water drainage in adjacent areas.

В случае возникновения чрезвычайной ситуации ключевую роль играет оперативность получения и обработки критических данных и донесения информации до лиц, здоровью и жизни которых грозит опасность. Автоматизация системы мониторинга и оповещения на Актюбинском водохранилище, как на потенциально опасном объекте, в случае необходимости обеспечит своевременное реагирование и позволит не только обезопасить людей в зоне бедствия, но и минимизировать размер материального ущерба от последствий.

Lessons learnt and recommendations made

Lessons learnt:

Lowered ground water level and improved reclamation status of irrigated land allowed tenant farmers and daikhan (farmer) associations in Dashoguz Velayat (Region) to increase crop productivity and, thus, gain additional income.

Recommendations:

Major project efforts to enhance the overall land condition in the target area resulted in improved public welfare.  The practice can benefit from the relevant Uzbekistan’s experience (systemic cleaning of collectors) – cleaning of intra-farm water supply networks simultaneously with inter-farm and/or main collector systems.  Uzbekistan’s model demonstrated sharp improvement of reclamation condition of entire land massifs.  Ecosystems are extremely vulnerable and without proper care future generations will have to take much more effort and spend more resources to restore them.

Учитывая, что Актюбинское водохранилище относится к категории потенциально опасных объектов, а город является пятым в Казахстане по численности населения (порядка 0,5 млн. жителей г. Актобе), реализация Проекта позволила обезопасить многих жителей от возможных водных бедствий и нивелировать их последствия: негативное воздействие на санитарно-гигиенические нормы, на эпидемиологическую обстановку, последствия для сельского хозяйства и всей биоты в зоне бедствия. Так, по оценкам международных экспертов,22 на каждый доллар, потраченный на снижение риска бедствий, с точки зрения предотвращения ущерба и затрат, возвращаются от четырех до семи долларов23. Исходя из данных исследований и общего бюджета Проекта, потенциальная экономическая выгода от внедрения системы автоматизации мониторинга и управления на Актюбинском водохранилище превышает 800 млн. тенге. Равномерная подача расхода воды за счет автоматизированного регулирования в рамках SCADA обеспечивает возможность увеличения орошаемых земель. При проектной площади орошения Актюбинского водохранилища в 4720 га., в 2015 и 2016 годах площадь использованных земель составил соответственно 1000 и 1200 га. В 2018 г. площадь орошаемых земель намечено довести до 6207 га.

Source of practice

Domestic tools (outcomes of research by domestic R&D organizations)

Методическое руководство: Безопасное и комплексное использование гидротехнических сооружений. Автоматизированная система управления Актюбинским водохранилищем. - Астана, 2018 - 56 стр

© Совместный проект ЕС/ПРООН/ЕЭК ООН «Поддержка Казахстана для перехода к модели зеленой экономики», 2018
© «Региональнальный экологический центр Центральной Азии», 2018

Readiness for implementation

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha: 100 долл. США

3. O&M costs: High

4. Expert support: Needed at implementation stage

Brief information on the project

Project title: Reconstruction of the Darialyk Interstate Collector (including water inlets).

Project duration: 2009-2016.

Project goal and objectives: improving passage of drainage water.

Project beneficiaries: water consumers of all levels in the area supplied by the Darialyk Collector.

Project implementer: Republic of Turkmenistan

Проект «Поддержка Казахстана для перехода к модели «зеленой экономики», одной из целей которого является содействие в создании системы устойчивого водопользования в стране, инциирован Делегацией Европейского Союза в Казахстане совместно с Программой Развития ООН, Европейской Экономической Комиссией ООН и Комитетом по водным ресурсам Министерства сельского хозяйства РК в 2015 г. с периодом реализации в три года до ноября 2018 г. Он направлен на поддержку проводимой в Казахстане политики по предупреждению чрезвычайных ситуаций, в т.ч. в водном секторе. 

Funding source Government of Turkmenistan Делегация Европейского Союза в Казахстане
Information sources

ASBP-3 Project

Совместная вспомогательной проектная инициатива ПРООН и РЭЦЦА «Распространение знаний и опыта по современным методам управления водой» (2018) к основному проекту Евросоюза «Поддержка Казахстана для перехода к модели «зеленой» экономики»

Contacts of a person, who filled this form

SIC ICWC

НИЦ МКВК

Form submission date 04.04.2018 05.11.2018