Select planning zone




Total 31 items.
NameUnitFormulaOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberNon GrowingGrowingYear Sum
Efficiency of inter-farm networkn1=0.790.790.790.790.790.790.790.790.790.790.790.794.744.749.48
Efficiency of on-farm networkn2=0.790.790.790.790.790.790.790.790.790.790.790.794.744.749.48
Leached land/Irrigated areaK_flu=0.720.720.720.720.720.720.720.720.720.720.720.724.324.328.64
Public water supply withdrawalMm3/monthWN_dom=1.451.163.550.640.263.923.433.723.805.504.581.9010.9822.9333.91
Water depth for leaching of irrigated landmm/monthWL_flu=0.000.00109.73109.73109.73109.730.000.000.000.000.000.00438.920.00438.92
Water withdrawal for industryMm3/monthWN_ind=7.566.4120.244.081.6223.5623.4728.2227.2740.5133.7313.4963.47166.69230.16
Water withdrawal for other purposesMm3/monthWN_oth=0.110.060.100.030.040.630.500.730.941.601.170.190.975.136.10
Limit for water withdrawal from local sourcesMm3/monthWLI_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Limit for water withdrawal from transboundary sourcesK_tr=0.750.750.750.750.750.750.750.750.750.750.750.754.504.509.00
Limit for water withdrawal from transboundary sourcesMm3/monthWLI_tr=43.37149.47144.030.00210.73432.40542.59602.99870.911311.811207.01401.67980.004936.985916.98
Amount of collector-drainage water re-use/Irrigation water withdrawal, excluding leachingK_rp=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Maximum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmax=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Minimum potential withdrawal from collector-drainage water for re-useMm3/monthWP_rpmin=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from groundwaterMm3/monthWP_gr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from local sourcesMm3/monthWP_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Potential water withdrawal from transboundary sourcesMm3/monthWP_tr=32.53112.10108.020.00158.05324.30406.94452.24653.18983.86905.26301.26735.003702.744437.74
Maximum water volume in reservoirsMm3/monthV_max=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Minimum water volume in reservoirsMm3/monthV_min=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water losses in reservoirsMm3/monthV_los=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month endMm3/monthV_end=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Water volume in reservoirs at month startMm3/monthV_beg=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing from neighboring PZsMm3/monthW_drfrom=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdraa_dr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Coefficients of functional relationship between drainage water quantity and irrigation water withdrab_dr=0.150.150.150.150.150.150.080.080.080.080.080.080.900.481.38
Coefficients of functional relationship between drainage water quantity and irrigation water withdrac_dr=14.7014.7014.7014.7014.7014.7058.9258.9258.9258.9258.9258.9288.20353.52441.72
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdraa_was=0.310.310.310.310.310.310.310.310.310.310.310.311.861.863.72
Coefficients of functional relationship between wastewater quantity and non-irrigation water withdrab_was=27.3327.3327.3327.3327.3327.3327.3327.3327.3327.3327.3327.33163.98163.98327.96
Local water sources formed in PZ or used in PZMm3/monthWR_loc=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water discharged into lakes and depressions of PZ/Total return flowK_drl=0.890.600.950.730.380.490.790.550.330.480.630.644.043.427.46
Amount of collector-drainage water discharged into rivers/Total return flowMm3/monthK_drtr=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Amount of collector-drainage water flowing to neighboring PZs/Total return flowK_drto=0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00