Название практики | Повышение уровня эксплуатации и технического обслуживания гидромелиоративных систем (ГМС) путем подготовки тренеров для обучения персонала и укрепления технического потенциала АВП | Application of tubular outlet flowmeters |
---|---|---|
Category | Water resources | Water resources |
Tool | Water distribution technology | Means and methods of water accounting |
Field of application | Использование водных ресурсов |
Use of water resources |
Usability of practice for adaptation to climate change | Moderate | Moderate |
Implemented by | Министерство сельского хозяйства и водных ресурсов Республики Узбекистан |
Institute of Water Issues, Hydropower and Ecology of the Academy of Sciences of the Republic of Tajikistan (IWIHE of the AS of the RTj) |
Used by |
Country: Uzbekistan Province: Tashkent Region |
Country: Tajikistan Province: Khatlon Region District: Jilikul |
Local specifics |
|
|
Practice usage period |
Start date: 01.11.2009 End date: 31.12.2013 |
Start date: 01.04.2010 End date: 31.10.2011 |
Problem solved through this practice | Несправедливое и неэффективное распределение водных ресурсов, низкий уровень технического обслуживания гидромелиоративной сети АВП. |
Uneven distribution of irrigation water, lack of water accounting means to ensure observance of recommended irrigation norms for cotton |
Tools used in the practice | Технические инструменты: планирование эксплуатации и технического обслуживания ГМС в АВП, водоучет. Когнитивные инструменты: консультации местных и зарубежных экспертов, тренинг тренеров, зарубежная учебная поездка |
Tubular water outlet flowmeter |
Description of the practice and its results | Мероприятия:
Результаты:
|
Actions: - Construction of tubular water outlet flowmeter with removable nozzles (procurement of polyethylene piping to make tubular water outlets and matching nozzles); Results: Financial and economic: saving of irrigation water; low cost of irrigation system automation (total kit cost: $500/ha) with the service life of 5 years. Technical: simple design allowing a more even distribution of irrigation water stream among furrows, thus, ensuring the prescribed water supply mode. Social: improved working conditions of irrigators; lower labor needs/costs; enhanced mutual trust among farmers and water users. |
Lessons learnt and recommendations made | Урок:
Рекомендация:
|
Lessons learnt: Installation and deployment of tubular water outlet flowmeter allows to improve the uniformity of irrigation stream’s distribution among furrows and conduct irrigation water accounting. Recommendations: It is necessary to widely use the small-scale irrigation automation means like the tubular water outlet flowmeters which have simple design, are convenient to operate, are low-cost and mobile and ensure supply of the prescribed amount of irrigation water. |
Source of practice | Международный проект (передача зарубежного опыта) |
Domestic tools (outcomes of research by domestic R&D organizations) |
Readiness for implementation |
1. Cost of implementation: Moderate 2. Approximate cost of investment per 1 ha: 3. O&M costs: Moderate 4. Expert support: Needed at implementation stage |
1. Cost of implementation: High 2. Approximate cost of investment per 1 ha: 3. O&M costs: High 4. Expert support: Not needed |
Brief information on the project | Краткая информация о проекте: Название: «Проект по совершенствованию управления водными ресурсами Республике Узбекистан» Продолжительность: Ноябрь 2009 – декабрь 2013 гг. (4 года) Цели и задачи: Усовершенствование управления водными ресурсами в пилотных АВП Получатели выгод от реализации проекта: водопотребители 6 пилотных АВП Структура, ответственная за реализацию проекта: Министерство сельского хозяйства и водных ресурсов Республики Узбекистан (Минсельводхоз РУз). Донор: Правительство Японии. |
Project title: Watering technology based on tubular water outlet flowmeters. Project duration: Apr 2010-Oct 2011. Project goal and objectives: development and deployment of a crop watering technology for dekhan farms of the Republic of Tajikistan allowing to significantly increase the efficiency of water use. Project beneficiaries: members of “Istikol” WUA (Water User Association). Project implementer: Institute of Water Issues, Hydropower and Ecology of the Academy of Sciences of the RTj |
Funding source | Кредит Правительства Японии (Японское агентство по международному сотрудничеству), а также госбюджетные средства Минсельводхоза | “Tajikistan Water Partnership” NGO |
Information sources | 1) Совместный итоговый отчет об оценке «Проекта по совершенствованию управления водными ресурсами в Республике Узбекистан», 2013г; 2) Эргашев Икрам, тел. +998-(или 0-5) 93-513-28-84 |
Report by the Innovation Technology Department of the IWIHE of the AS of the RTj, Dushanbe, 2012, 45 p. |
Contacts of a person, who filled this form | ФИО: Мирзаев Н. Телефон: +998-90-980-26-82 Электронный адрес: mirzaevicwc@gmail.com |
SIC ICWC |
Form submission date | 26.08.2018 | 02.04.2018 |