Название практики | Повышение уровня эксплуатации и технического обслуживания гидромелиоративных систем (ГМС) путем подготовки тренеров для обучения персонала и укрепления технического потенциала АВП | Land reclamation via vertical drainage wells |
---|---|---|
Category | Water resources | Water resources |
Tool | Water distribution technology | Collector-drainage system |
Field of application | Использование водных ресурсов |
• Use of water resources |
Usability of practice for adaptation to climate change | Moderate | Moderate |
Implemented by | Министерство сельского хозяйства и водных ресурсов Республики Узбекистан |
Ministry of Reclamation and Water Management of the Republic of Kazakhstan |
Used by |
Country: Uzbekistan Province: Tashkent Region |
Country: Kazakhstan Province: South Kazakhstan Region District: Maktaaral District |
Local specifics |
|
• Upstream (Ferghana) and midstream (Syr Darya) of the Syr Darya River |
Practice usage period |
Start date: 01.11.2009 End date: 31.12.2013 |
Start date: 01.01.1965 End date: 31.12.1975 |
Problem solved through this practice | Несправедливое и неэффективное распределение водных ресурсов, низкий уровень технического обслуживания гидромелиоративной сети АВП. |
Deterioration of reclamation situation: rising of ground water, land salination |
Tools used in the practice | Технические инструменты: планирование эксплуатации и технического обслуживания ГМС в АВП, водоучет. Когнитивные инструменты: консультации местных и зарубежных экспертов, тренинг тренеров, зарубежная учебная поездка |
Technique and technology of land reclamation via a system of vertical drainage wells (VDW) |
Description of the practice and its results | Мероприятия:
Результаты:
|
Actions: A VDW system set up. Prior to its installation, the area was drained via a horizontal open-type drain-age network ineffective as to reducing the mass of salinized land. Comprehensive VDW efforts significantly enhanced drainage.
Results: Financial and economic: Technical: |
Lessons learnt and recommendations made | Урок:
Рекомендация:
|
Lessons learnt: In due time, the model proved useful and timely, as the country urgently needed to increase its cotton yields. The practice demonstrated high efficiency of VDW in combatting land salination. Recommendations: 1. Establish a special VDW System Maintenance and Operation Department; |
Source of practice | Международный проект (передача зарубежного опыта) |
Domestic tools (outcomes of research by domestic R&D organizations) |
Readiness for implementation |
1. Cost of implementation: Moderate 2. Approximate cost of investment per 1 ha: 3. O&M costs: Moderate 4. Expert support: Needed at implementation stage |
1. Cost of implementation: Moderate 2. Approximate cost of investment per 1 ha: 3. O&M costs: High 4. Expert support: Not needed |
Brief information on the project | Краткая информация о проекте: Название: «Проект по совершенствованию управления водными ресурсами Республике Узбекистан» Продолжительность: Ноябрь 2009 – декабрь 2013 гг. (4 года) Цели и задачи: Усовершенствование управления водными ресурсами в пилотных АВП Получатели выгод от реализации проекта: водопотребители 6 пилотных АВП Структура, ответственная за реализацию проекта: Министерство сельского хозяйства и водных ресурсов Республики Узбекистан (Минсельводхоз РУз). Донор: Правительство Японии. |
|
Funding source | Кредит Правительства Японии (Японское агентство по международному сотрудничеству), а также госбюджетные средства Минсельводхоза | Ministry of Reclamation and Water Management of the USSR |
Information sources | 1) Совместный итоговый отчет об оценке «Проекта по совершенствованию управления водными ресурсами в Республике Узбекистан», 2013г; 2) Эргашев Икрам, тел. +998-(или 0-5) 93-513-28-84 |
Reshetkina N.M. et al. “Vertical Drainage”, Moscow: Kolos, 1978. – 319 p. |
Contacts of a person, who filled this form | ФИО: Мирзаев Н. Телефон: +998-90-980-26-82 Электронный адрес: mirzaevicwc@gmail.com |
SIC ICWC |
Form submission date | 26.08.2018 | 26.03.2018 |