Название практики |
Set of hydro-reclamation measures |
Внедрение принципов интегрированного управления водными ресурсами (ИУВР) на малой трансграничной реке Исфара |
Category |
Water resources |
Water resources |
Tool |
Set of hydro-reclamation measures |
Public participation principle |
Field of application |
- Use of water resources
- Use of land resources
- Environmental protection
|
- Использование водных ресурсов
- Использование земельных ресурсов
|
Usability of practice for adaptation to climate change |
Low |
High |
Implemented by |
Ministry of Nature Protection of Turkmenistan and German Technical Cooperation Agency (GIZ)
|
АМР США/РЭЦЦА
|
Used by |
Country: Turkmenistan
Province: Mary Region
District: Sakarçäge District
Other settlement: Zakhmet Daikhan Farm
|
Country: Kyrgyzstan
|
Local specifics |
Sakar-Chaga District (area of 53,000 ha; population of 132,000 people) is located in the northwestern part of Mary Region in the Murgab River delta. The majority of local residents live in the oasis hosting 80% of settlements. |
Трансграничная река |
Practice usage period |
Start date: 01.01.2009
End date: 31.12.2010
|
Start date: 01.04.2012
End date: 31.10.2016
|
Problem solved through this practice |
Land salination represents the main challenge in the area due to improper irrigation technology and lack of drainage, in their turn leading to extremely low productivity. With time, the existing irrigation management system resulted in irrational use of water and land. While water distribution rates were calculated in a centralized manner depending on specific crops, in practice water supply monitoring is extremely poor – water supply (canals) infrastructure is inconsistent with farmers’ needs leading to excessive and, vice versa, insufficient watering of different sites. In addition, there exists an informal water payment system leading to the advantageous position of certain users. |
Несовершенство механизма руководства водой в бассейне трансграничной малой реки Исфара |
Tools used in the practice |
Set of hydro-reclamation measures: preventive land forming (leveling), composting, monitoring of ground water bedding and mineralization, decentralized water management planning, capacity building, etc. |
Принцип вовлечения заинтересованных сторон в процесс принятия решений по руководству водой на малой трансграничной реке. Методика планирования ИУВР |
Description of the practice and its results |
Actions:
A series of measures were executed to prevent land degradation and improve land reclamation condition, including introduction of high-performance drainage systems and reclamation technologies, construction of a new collector and cleaning of the existing one, construction of 9 water-regulating and 2 water-measuring facilities.
Results:
- 50 hectares of degraded land rehabilitated and can be used for agricultural purposes. About 35 ha of land saved from degradation thanks to preventive land forming;
- regular seminars held for land users on potential ways of applying various advanced methods of maintaining rural economy and effective use of water resources;
- about 60 measuring stations installed to monitor the level and mineralization of ground water.
|
Река берёт начало в Кыргызстане от ледника Ак-Суу на северном склоне Туркестанского хребта, на высоте 3193,0 м. Близ точки начала реки стоят развалины Ак-Суу. В районе населённого пункта Каравшин река получает то же название. На государственной границе сливается с рекой Кшемыш (Кшемышсай) и, далее, река получает название Исфара.
Мероприятия:
Созданы группы заинтересованных сторон – Малые Бассейновые Советы (МБС). В МБС вошли представители местных властей, НПО, водопользователи и местные жители. Секретариаты МБС самостоятельно организуют внутренние заседания как минимум два раза в год. Таким образом, была сформирована площадка для обмена мнениями, информацией и разработки совместных решений по улучшению ситуации в бассейне реки Исфара.
Результаты:
Созданием национальных Малых Бассейновых Советов (МБС) реки Исфара была сформирована площадка для обмена мнениями, информацией и разработки совместных решений по улучшению ситуации в бассейне реки Исфара. Разработан бассейновый план ИУВР реки Исфара. |
Lessons learnt and recommendations made |
Lessons learnt:
- salinized land was rehabilitated not only thanks to reclamation actions but also by composting. In particular, high-quality humus is produced to enhance soil salinity parameters;
- the process of designing water use plans for individual farmers launched;
- one new collector built.
Recommendations:
It is necessary to focus on strengthening the role of local associations in rendering irrigation services and managing the canal’s water level. Local water users will be rendered an opportunity to design effective irrigation water management schemes. The experience of decentralized water planning and management accumulated by water tenants will be documented and distributed as a part of knowledge-management (capacity-building) strategy. It is necessary to closely cooperate with the newly established Agriculture Advisory Service working on sustainable land and water management, as well as to disseminate corresponding practices in other areas. |
Уроки:
Внедрение принципов ИУВР является условием стабильного и равноправного водообеспечения вне зависимости от местоположения водопользователя.
Рекомендации:
В настоящее время, когда местные заинтересованные стороны, представленные в МБС, вовлечены в процесс руководства водой, нужно организовать семинары, чтобы работы МБС в дальнейшем не приостановлены. В перспективе, возможно, появится необходимость и возможность создания совместного органа руководства водой по всему бассейну реки. |
Source of practice |
Domestic tools (outcomes of research by domestic R&D organizations) |
Зарубежные инструменты (передача зарубежного опыта) |
Readiness for implementation |
1. Cost of implementation: High
2. Approximate cost of investment per 1 ha:
3. O&M costs: High
4. Expert support: Not needed
|
1. Cost of implementation: Low
2. Approximate cost of investment per 1 ha:
3. O&M costs: Low
4. Expert support: Needed at implementation stage
|
Brief information on the project |
Project title: Local-level capacity building and investment for sustainable management of land resources.
Project duration: 2009-2010.
Project goal and objectives: overcoming barriers to higher efficiency and performance of water supply systems in climate change induced drought conditions.
Project beneficiaries: Zakhmet Daikhan Farm (approximately 300 daikhan households).
Project implementer: Ministry of Nature Protection of Turkmenistan and German Technical Cooperation Agency (GIZ). |
Одним из основных элементов интегрированного управления водными ресурсами является разработка и реализация Бассейновых планов. Важным преимуществом ИУВР является функционирование механизма межведомственной координации через создание бассейновых советов или координационных групп. Такой подход позволяет обеспечить четкую координацию и синергизм действий на всех уровнях иерархии управления.
Название: «Партнерство заинтересованных сторон в совместной разработке политики: Содействие трансграничному сотрудничеству на малых водоразделах в Центральной Азии» Продолжительность: апрель 2012 - октябрь 2016 Цели и задачи: Внедрение практики интегрированного управления водными ресурсами (ИУВР) в трех трансграничных водоразделах и её распространение в Центральной Азии. Получатели выгод от его реализации: Население малых трансграничных бассейнов Исфара, специалисты водных и природоохранных ведомств, фермеры Структура, ответственная за реализацию проекта: АМР США/РЭЦЦА |
Funding source |
UNDP and Global Environmental Facility |
АМР США (USAID) |
Information sources |
http://www.turkmenistan.ru/?page_id=3&lang_id=ru&elem_id=17207&type=event&layout=print&sort=date_desc |
carecnet.org |
Contacts of a person, who filled this form |
SIC ICWC |
НИЦ МКВК |
Form submission date |
17.04.2018 |
09.08.2017 |