Название практики Совершенствование водораспределения в АВП путем разработки и реализации декадного план-графика водоподачи АВП в разрезе водопотребителей и суток Land reclamation via vertical drainage wells
Category Water resources Water resources
Tool Water distribution technology Collector-drainage system
Field of application

Использование водных ресурсов

• Use of water resources
• Use of land resources

Usability of practice for adaptation to climate change Moderate Moderate
Implemented by Научно-информационный центр Межгосударственной координационной водохозяйственной комиссии (НИЦ МКВК) и Швейцарское агентство по развитию и сотрудничеству (SDC)
Ministry of Reclamation and Water Management of the Republic of Kazakhstan
Used by

Country: Kyrgyzstan

Province: Osh Region

District: Kara-Suu District

Other settlement: АВП в зоне магистрального канала Араван-Акбура

Country: Kazakhstan

Province: South Kazakhstan Region

District: Maktaaral District

Local specifics

Бассейн реки Акбура

Близкое залегание грунтовых вод

• Upstream (Ferghana) and midstream (Syr Darya) of the Syr Darya River
• Ebb occurrence of highly mineralized ground water

Practice usage period

Start date: 01.01.2003

End date: 31.12.2011

Start date: 01.01.1965

End date: 31.12.1975

Problem solved through this practice
  • Неравномерность распределения воды потребителям (проблема «голова-конец»),
  • Нестабильность водоподачи потребителям,
  • Значительные организационные потери воды.

Deterioration of reclamation situation: rising of ground water, land salination

Tools used in the practice

Принципы водооборота и общественного участия

Technique and technology of land reclamation via a system of vertical drainage wells (VDW)

Description of the practice and its results

Равномерное и справедливое водораспределение между водопользователями в контурах АВП, четкая взаимоувязка графиков водоподачи по каналам АВП всех порядков с графиком водоподачи в отводы АВП из магистральных каналов обеспечивается в результате усовершенствования существующей методики планирования водораспределения с использованием водооборота, технологически осуществимой водоподачи, реализуемой при декадном (в пределах декад вегетационного периода) планировании.

Мероприятия:

При декадном графике водораспределения плановый декадный расход воды поочередно подается ВП (в соответствии с их заявками на воду) и составляется декадный график распределения воды. Декадные графики распределения воды оперативно корректируется с учетом изменения водности источников воды. Эта методика основана на широком участии в процессе водораспределения самих ВП. Кроме этого, весь процесс от начало планирования до фактической подачи воды ВП можно проверить с помощью имеющихся документов: декадный график распределения воды; заявка на воду ВП и АВП; журнал регистрации заявок; журнал учета воды в голове канала АВП и на отводах АВП.

Результаты:

В результате внедрения декадного графика водораспределения в 2009-2011 гг.:

  • уменьшился фактический водозабор. Несмотря на это, водообеспеченность среди ВП осталась высокой за счет повышения эффективности водораспределения внутри АВП, что создало 90 % обеспеченности и позволило получить высокие урожаи СХК;
  • повысился КПД оросительной сети с 0,69 до 0,79. Объем сэкономленной воды за счет снижения потерь воды в оросительной сети АВП 8 % от общего фактического объема водозабора;
  • повысился чистый доход от прироста урожайности за счёт роста водообеспеченности основных сельскохозяйственных кульур;
  • резко сократились споры и конфликты, связанные не только с водопользованием, но и с финансовой, экономической и организационной устойчивостью АВП;
  • ВП, расположенные в концевой части каналов АВП стали получать безопасную для СХК воду, вместо минерализованных коллекторно-дренажных вод.

Actions:

A VDW system set up. Prior to its installation, the area was drained via a horizontal open-type drain-age network ineffective as to reducing the mass of salinized land.

Comprehensive VDW efforts significantly enhanced drainage.


However, currently due to the absence of a single organization responsible for VDW operation, maintenance and repair, the VDW systems recon-structed under World Bank and Asian Development Bank projects do not perform as effectively as ini-tially.

Results:

Financial and economic:
Increased cotton yields (from 10-15 up to 30-35 dt/ha).

Technical:
Successful response to land salination in 3 districts: ground water table steadily kept at 2-3 m depth leading to a sharp contraction of salinized land area.

Lessons learnt and recommendations made

Уроки:

В результате правильной организации водопользования в АВП на 50–80% уменьшился забор воды в верхней части магистральных каналов и рек, в результате уменьшился непродуктивный сброс в коллекторы и впадины. С другой стороны, из-за уменьшения водозабора в головной части магистральных каналов и рек в концевой части увеличился приток оросительной воды с высоким качеством. Тем самым будут соблюдаться экологические требования для сохранения флоры и фауны.

Рекомендация:

Нужно и можно распространить практику декадного планирования водораспределения в АВП по республике.

Lessons learnt:

In due time, the model proved useful and timely, as the country urgently needed to increase its cotton yields. The practice demonstrated high efficiency of VDW in combatting land salination.

Recommendations:

1. Establish a special VDW System Maintenance and Operation Department;
2. Build personnel capacity:
• Continual training of personnel in the Department and Provincial Hydrogeological and Land Reclamation Expedition;
• Drafting and distribution of training materi-als.

Source of practice

Данная практика результатом внедрения:

  • Традиционных подходов, которые передаются из поколения в поколение и показали ценность в современных условиях;
  • Научно-исследовательских работ

Domestic tools (outcomes of research by domestic R&D organizations)

Readiness for implementation

1. Cost of implementation: Moderate

2. Approximate cost of investment per 1 ha:

3. O&M costs: Moderate

4. Expert support: Needed at O&M stage

1. Cost of implementation: Moderate

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

Brief information on the project

Название: Интегрированное управление водными ресурсами в Ферганской долине («ИУВР-Фергана»).

Продолжительность:01.01.2001-31.12.2012 гг. (12 лет).

Цели и задачи: Общей целью проекта является «внести вклад в более безопасное существование, экологическую устойчивость и большую социальную гармонию, поддержать сельскую реструктуризацию в странах Центральной Азии путем повышения эффективности управления водными ресурсами - на примере Ферганской долины».

Получатели выгод от его реализации: АВП, фермеры в зоне проекта.

Структура, ответственная за реализацию проекта: IWMI, НИЦ МКВК, Наблюдательный Комитет проекта (НКП), состоящий из трех представителей Министерств Сельского и Водного Хозяйства (МСВХ) стран, охваченных проектом, трех начальников Облводхозов, на территории которых расположены пилотные объекты.

Донор: Швейцарское управление по развитию и сотрудничеству (SDC).

Funding source Грант Правительства Швейцарии Ministry of Reclamation and Water Management of the USSR
Information sources

Руководство по составлению и корректировке планов водораспределение на уровне АВП на основе суточного планирования;

Руководство по распределению оросительной воды на уровне АВП;

Пособие по организации мониторинга водопользования на уровне АВП.

Reshetkina N.M. et al. “Vertical Drainage”, Moscow: Kolos, 1978. – 319 p.

Contacts of a person, who filled this form

НИЦ МКВК

SIC ICWC

Form submission date 09.08.2017 26.03.2018

Partners