Interactive map of the best practices

on the use of water, land and energy resources,
as well as the environment of Central Asia

Comparison of practices

Название практики Set of hydro-reclamation measures Transition from territorial to hydro-graphic principle of managing the Southern Fergana Main Canal (SFMC)
Category Water resources Water resources
Tool Set of hydro-reclamation measures Hydrographic boundary-based principle
Field of application
  • Use of water resources
  • Use of land resources
  • Environmental protection

Use of water resources

Usability of practice for adaptation to climate change Low Moderate
Implemented by Ministry of Nature Protection of Turkmenistan and German Technical Cooperation Agency (GIZ)
Head Water Administration Office of the Ministry of Agriculture and Water Management of the Republic of Uzbekistan (MAWM of the RUz) jointly with ICWC SIC/IWMI within the framework of the IWRM-Fergana Project
Used by

Country: Turkmenistan

Province: Mary Region

District: Sakarçäge District

Other settlement: Zakhmet Daikhan Farm

Country: Uzbekistan

Province: Andijan Region

Local specifics

Sakar-Chaga District (area of 53,000 ha; population of 132,000 people) is located in the northwestern part of Mary Region in the Murgab River delta. The majority of local residents live in the oasis hosting 80% of settlements.

Uzbekistan’s section of the Fergana Valley; the Kara Darya River Basin

Practice usage period

Start date: 01.01.2009

End date: 31.12.2010

Start date: 01.01.2001

End date: 31.12.2012

Problem solved through this practice

Land salination represents the main challenge in the area due to improper irrigation technology and lack of drainage, in their turn leading to extremely low productivity. With time, the existing irrigation management system resulted in irrational use of water and land. While water distribution rates were calculated in a centralized manner depending on specific crops, in practice water supply monitoring is extremely poor – water supply (canals) infrastructure is inconsistent with farmers’ needs leading to excessive and, vice versa, insufficient watering of different sites. In addition, there exists an informal water payment system leading to the advantageous position of certain users.

  1. Prior to the implementation of the IWRM-Fergana Project, SFMC was managed based on the territorial principle by 3 water management organizations (WMOs): Andizhan Regional Water Administration, Operation Department of the Main Fergana Trunk Canal, and Fergana Regional Water Administration.
  2. On the borders between regions and districts (especially between Andizhan and Fergana Regions (Polvontosh Hydro Section)) frequent water distribution related conflicts took place;
  3. The quality of water management (uniformity, stability and efficiency of water supply) was poor.
Tools used in the practice

Set of hydro-reclamation measures: preventive land forming (leveling), composting, monitoring of ground water bedding and mineralization, decentralized water management planning, capacity building, etc.

The hydro-graphic principle of main trunk canal management

Description of the practice and its results

Actions:

A series of measures were executed to prevent land degradation and improve land reclamation condition, including introduction of high-performance drainage systems and reclamation technologies, construction of a new collector and cleaning of the existing one, construction of 9 water-regulating and 2 water-measuring facilities.

Results:

  • 50 hectares of degraded land rehabilitated and can be used for agricultural purposes. About 35 ha of land saved from degradation thanks to preventive land forming;
  • regular seminars held for land users on potential ways of applying various advanced methods of maintaining rural economy and effective use of water resources;
  • about 60 measuring stations installed to monitor the level and mineralization of ground water.

Actions:

Instead of 3 WMOs established based on the territorial-administrative principle, one organization (Administration of the Southern Fergana Main Canal, ASFMC) was created on the basis of the hydro-graphic principle.  ASFMC is fully responsible for maintenance and operation of the SFMC from the point of water intake to the very end of the canal (see figures).

 Results:

 Transition to the hydro-graphic principle of establishing WMOs allowed to do the following:

  • sharply decrease the number of water conflicts on the borders between regions and districts;
  • enhance the uniformity (fairness) of water resources distribution;
  • enhance the stability of water supply;
  • reduce organizational losses.
Lessons learnt and recommendations made

Lessons learnt:

  • salinized land was rehabilitated not only thanks to reclamation actions but also by composting. In particular, high-quality humus is produced to enhance soil salinity parameters;
  • the process of designing water use plans for individual farmers launched;
  • one new collector built.

Recommendations:

It is necessary to focus on strengthening the role of local associations in rendering irrigation services and managing the canal’s water level.  Local water users will be rendered an opportunity to design effective irrigation water management schemes.  The experience of decentralized water planning and management accumulated by water tenants will be documented and distributed as a part of knowledge-management (capacity-building) strategy.  It is necessary to closely cooperate with the newly established Agriculture Advisory Service working on sustainable land and water management, as well as to disseminate corresponding practices in other areas.

Lessons learnt:

  1. Transition to the hydro-graphic principle of establishing WMOs constitutes an institutional tool of improving the quality of water management as it allows implementing a more objective and fair water management policy less dependent on local authorities;
  2. Local authorities are not interested in transiting to the hydro-graphic principle and demonstrate resistance to the process.

Recommendations:

Transition to the hydro-graphic principle should be preceded by the following:

  1. comprehensive analysis of water allocation issues along the target main canal;
  2. training aimed at educating water-related personnel and decision-makers on integrated water resources management (IWRM).
Source of practice

Domestic tools (outcomes of research by domestic R&D organizations)

  • Traditional approaches that had been applied in water management earlier;
  • International project (transfer of foreign experience).
Readiness for implementation

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

Brief information on the project

Project title: Local-level capacity building and investment for sustainable management of land resources.

Project duration: 2009-2010.

Project goal and objectives: overcoming barriers to higher efficiency and performance of water supply systems in climate change induced drought conditions.

Project beneficiaries: Zakhmet Daikhan Farm (approximately 300 daikhan households).

Project implementer: Ministry of Nature Protection of Turkmenistan and German Technical Cooperation Agency (GIZ).

Project title: Integrated Water Resources Management in the Fergana Valley (IWRM-Fergana).

Project duration: Jan 01, 2001-Dec 31, 2012 (12 years).

Project goal and objectives: overall project goal was “to contribute to safer living, environmental sustainability and wide social harmony, to support rural restructuring in Central Asian countries by enhancing water resources management based on the example of the Ferghana Valley”.

Project beneficiaries: water users and water consumers within the project site.

Project implementer: Head Water Administration Office of the MAWM of the RUz jointly with ICWC SIC/IWMI

Funding source UNDP and Global Environmental Facility Swiss Agency for Development and Cooperation (SDC)
Information sources

http://www.turkmenistan.ru/?page_id=3&lang_id=ru&elem_id=17207&type=event&layout=print&sort=date_desc 

Contacts of a person, who filled this form

SIC ICWC

SIC ICWC

Form submission date 17.04.2018 30.04.2018

Partners