Interactive map of the best practices

on the use of water, land and energy resources,
as well as the environment of Central Asia

Comparison of practices

Название практики Increasing water availability of pastures by constructing sardobas Introduction of Integrated Water Resources Management (IWRM) principles on the Isfara small transboundary river
Category Water resources Water resources
Tool System for enhancing water availability Public participation principle
Field of application
  • Use of water resources
  • Use of land resources
  • Environmental protection
  • Use of water resources
  • Use of land resources
Usability of practice for adaptation to climate change Moderate High
Implemented by Ministry of Nature Conservation of Turkmenistan
USAID/CAREC
Used by

Country: Turkmenistan

Country: Kyrgyzstan

Local specifics

17,238 ha of barkhan (sand dune), takyr (dry-type playa) and solonchak (moist-type playa) sites of the Kara Kum Desert; deep ground water occurrence

Transboundary river

Practice usage period

Start date: 01.01.2012

End date: 31.12.2016

Start date: 01.04.2012

End date: 31.10.2016

Problem solved through this practice

Desertification and decreased productivity of desert pastures due to over-grazing around existing cattle watering sites

Imperfections of the water management mechanism in the Isfara small transboundary river basin

Tools used in the practice

Technology of building sardobas (stone-dome covered water collection and storage reservoirs) to enhance pasture water supply

The principle of stakeholder engagement in decision-making associated with water management of small transboundary river;

IWRM planning technique

Description of the practice and its results

Main actions:

  • mudflow and flood risk assessment and surveying local population regarding sardobas’ locations.

Actions:

  • selection of takyrs to construct sardobas jointly with local cattle-farmers;
  • construction of sardobas jointly with local cattle-farmers;
  • cleaning takyr surfaces.

Results:

  • pastures that were not previously utilized due to absence of water sources returned to pasture rotation;
  • pastures destroyed due to over-grazing started to restore;
  • increased herd productivity due to reduced passage distances and higher fodder value of pastures.

The river originates in Kyrgyzstan in Ak-Suu Glacier on the northern slope of the Turkestan Ridge 3,193 m above sea level.  The Ak-Suu ruins are located close to the river source.  Near the settlement of Karavshin, the river is called the same name.  Crossing the national border, the river merges with the Kshemysh River (Kshemyshsai) and, further on, the river receives the name of Isfara.

 Actions:

Establishment of stakeholder groups, i.e. Small Basin Councils (SBC) representing local authorities, NGOs, water users and local communities.  SBC secretariats independently hold internal semi-annual meetings.  Thus, the SBCs serve as platforms to exchange opinions and information as well as take joint decisions associated with the enhancement of the overall situation in the river basin.

Results:

Creation of national Small Basin Councils (SBC) on the Isfara River allowed a platform for exchanging opinions and information as well as for drawing joint decisions to improve the overall situation in the Isfara River Basin, including the development of the IWRM basin plan for the target basin.

Lessons learnt and recommendations made

Lessons learnt:

Construction of sardobas in takyr areas allows enhancing pasture water supply, thus, leading to the restoration of over-grazed pastures.

Recommendations:

The practice requires long-term planning and an integrated response with the early-on engagement of desertification experts (designing a set of measures to protect takyrs from sand drifts), state agencies (technical assistance) and pasture users (observance of pasture rotation schemes, prevention of takyrs from contamination and pollution).

Lessons learnt:

Introduction of IWRM principles is the pre-requisite of stable and fair water supply irrespective of a given water user’s location.

Recommendations:

Currently, when local stakeholders are represented in SBCs and are engaged in joint water management, it is necessary to hold thematic seminars to ensure sustainability of SBC operations in the future.  In the long term, it might be possible to establish a joint body to manage the whole river basin.

Source of practice

Traditional tools transferred from generation to generation that proved their efficiency in modern conditions

Foreign tools (transfer of foreign experience)

Readiness for implementation

1. Cost of implementation: Low

2. Approximate cost of investment per 1 ha: $1,000-5,000

3. O&M costs: Low

4. Expert support: Needed at implementation stage

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

Brief information on the project

Project title: Responding to climate change risks for dekhan farming system of Turkmenistan on national and local levels.

Project duration: 2012-2016. 

Project goal and objectives: build the adaptation capacity to respond to climate change impacts, including variability on local and national levels. 

Project beneficiaries: Bori Settlement (over 1,100 people) and Bo-Kurdak Settlement (about 4,500 people).

Project implementer: Ministry of Nature Conservation and UNDP

Development and implementation of basin plans constitute principal elements of integrated water resources management.  Multi-agency coordination mechanism via basin councils or coordination groups is an important advantage of IWRM.  This approach allows streamlined coordination and synergy of actions on all levels of management hierarchy.

Project title: Stakeholder partnership in joint policy-making: assistance to transboundary cooperation in small watersheds of Central Asia.

Project duration: Apr 2012-Oct 2016

Project goal and objectives: introduction of the integrated water resources management (IWRM) practice in three transboundary watersheds and its scaling-up in Central Asia.

Project beneficiaries: communities of the Isfara small transboundary river basin, specialists of water and environmental agencies, farmers.

Project implementer: USAID/CAREC.

Funding source Government of Turkmenistan, Adaptation Facility USAID
Information sources

tm.undp.org

carecnet.org

Contacts of a person, who filled this form

SIC ICWC

SIC ICWC

Form submission date 04.04.2018 02.04.2018

Partners