Название практики Improving water use planning technology based on CROPWAT 8.0 Software Improving reclamation condition of arable land around West Karmakshi Collector
Category Water resources Water resources
Tool Model CROPWAT 8.0 Collector-drainage system
Field of application

Use of water resources

• Use of water resources
• Use of land resources

Usability of practice for adaptation to climate change High Moderate
Implemented by UN FAO in the Republic of Tajikistan, Sh. Shotemur Tajik Agrarian University (TAU)

Used by

Country: Tajikistan

Province: Districts of Republican Subordination

District: Shahrinaw

Other settlement: Mirob” Water User Association (WUA)

Country: Kazakhstan

Province: Kyzylorda Region

District: Karmakshy District

Other settlement: a/o “Aktobe”, a/o “III International”

Local specifics

Mirob WUA is located in the Kafirnigan and Varzob River Basins (river catchment areas); deep (below 3 m) ground water occurrence; middle loamy soils

The site is located in the lower reaches of the Syr Darya River (inter-riverbed depression strip)

Practice usage period

Start date: 01.01.2012

End date: 31.12.2013

Start date: 01.01.2010

End date: 31.12.2011

Problem solved through this practice

Need to enhance water use planning and water consumption calculation techniques for agricultural crops with the account of climatic conditions and crop development phases based on decade water use planning hydro-modules proceeding from precipitation availability.

Increasing secondary land salination, deterioration of col-lector and drainage system (CDS)

Tools used in the practice

CROPWAT 8.0 Software

A set of measures to enhance land reclamation condition (collector cleaning using special equipment, reconstruction of hydraulic engineering installations, etc.)

Description of the practice and its results

Actions:

  • Analysis of existing methods of water resources use planning in dekhan farms of the Gissar Valley;
  • Designing a water use planning technique with the account of irrigation patterns in dekhan farms.

Results:

Financial and economic:

effective use of irrigation water; reduced water consumption per harvest unit.

Ecological:

improved ecological and reclamation condition of irrigated land.

Technical:

executed decade hydro-modules based on precipitation availability allowing dekhan farms to plan their water consumption and draw up crop irrigation schedules depending on expected weather conditions in the Gissar Valley as well as to coordinate other technological and weather-dependent processes associated with crops cultivation.

Social:

prevention of conflicts, controversies and misunderstanding among water users related to irrigation water distribution.

Actions:
The capital repair of inter-farm West Karmakshi Collector (WKC) is necessitated by the fact that in its current condition the Collector didn't provide for timely drainage of drainages and discharge water from cropland in the Left-Bank Massif.

Results:

Financial and economic:
Increased crop productivity, mainly rice and forage crops

Technical:
Enhanced reclamation condition of land in the Left-Bank Massif

Lessons learnt and recommendations made

Lessons learnt:

CROPWAT 8.0 Software allows enhancing the technology of water use planning via specification of irrigation modes depending on expected precipitation availability.

Recommendations:

It is necessary to widely apply CROPWAT 8.0 Software.

Lessons learnt:
Allocation of resources for cleaning CDS proved more efficient than other target actions

Recommendations:
Regular and timely execution of running and capital collector cleaning is necessary to ensure its proper operation

Source of practice

Foreign tools (transfer of foreign experience)

Domestic tools (outcomes of research by domestic R&D organizations)

Readiness for implementation

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

1. Cost of implementation: High

2. Approximate cost of investment per 1 ha:

3. O&M costs: High

4. Expert support: Not needed

Brief information on the project

Project title: Improving water use planning technology based on CROPWAT 8.0 Software.

Project duration: 2012-2013.

Project goal and objectives: design a science-based water use planning technique using CROPWAT 8.0 Software to calculate water consumption for different crops with the account of climatic conditions and crops development phases based on decade water use planning hydro-modules proceeding from precipitation availability.

Project beneficiaries: water users of Mirob WUA.

Project implementer: Sh. Shotemur TAU.

Funding source United Nations Food and Agriculture Organization (UN FAO) in the Republic of Tajikistan Ministry of Reclamation and Water Management of the Republic of Kazakhstan
Information sources

Report by the Operation of Hydro and Reclamation Systems Chair of Sh. Shotemur TAU, Dushanbe, 2013, 46 p.

Contacts of a person, who filled this form

SC ICWC

SIC ICWC

Form submission date 03.04.2018 29.03.2018