Название практики | Land reclamation via vertical drainage wells | Повышение уровня эксплуатации и технического обслуживания гидромелиоративных систем (ГМС) путем подготовки тренеров для обучения персонала и укрепления технического потенциала АВП |
---|---|---|
Category | Water resources | Water resources |
Tool | Collector-drainage system | Water distribution technology |
Field of application | • Use of water resources |
Использование водных ресурсов |
Usability of practice for adaptation to climate change | Moderate | Moderate |
Implemented by | Ministry of Reclamation and Water Management of the Republic of Kazakhstan |
Министерство сельского хозяйства и водных ресурсов Республики Узбекистан |
Used by |
Country: Kazakhstan Province: South Kazakhstan Region District: Maktaaral District |
Country: Uzbekistan Province: Tashkent Region |
Local specifics | • Upstream (Ferghana) and midstream (Syr Darya) of the Syr Darya River |
|
Practice usage period |
Start date: 01.01.1965 End date: 31.12.1975 |
Start date: 01.11.2009 End date: 31.12.2013 |
Problem solved through this practice | Deterioration of reclamation situation: rising of ground water, land salination |
Несправедливое и неэффективное распределение водных ресурсов, низкий уровень технического обслуживания гидромелиоративной сети АВП. |
Tools used in the practice | Technique and technology of land reclamation via a system of vertical drainage wells (VDW) |
Технические инструменты: планирование эксплуатации и технического обслуживания ГМС в АВП, водоучет. Когнитивные инструменты: консультации местных и зарубежных экспертов, тренинг тренеров, зарубежная учебная поездка |
Description of the practice and its results | Actions: A VDW system set up. Prior to its installation, the area was drained via a horizontal open-type drain-age network ineffective as to reducing the mass of salinized land. Comprehensive VDW efforts significantly enhanced drainage.
Results: Financial and economic: Technical: |
Мероприятия:
Результаты:
|
Lessons learnt and recommendations made | Lessons learnt: In due time, the model proved useful and timely, as the country urgently needed to increase its cotton yields. The practice demonstrated high efficiency of VDW in combatting land salination. Recommendations: 1. Establish a special VDW System Maintenance and Operation Department; |
Урок:
Рекомендация:
|
Source of practice | Domestic tools (outcomes of research by domestic R&D organizations) |
Международный проект (передача зарубежного опыта) |
Readiness for implementation |
1. Cost of implementation: Moderate 2. Approximate cost of investment per 1 ha: 3. O&M costs: High 4. Expert support: Not needed |
1. Cost of implementation: Moderate 2. Approximate cost of investment per 1 ha: 3. O&M costs: Moderate 4. Expert support: Needed at implementation stage |
Brief information on the project | Краткая информация о проекте: Название: «Проект по совершенствованию управления водными ресурсами Республике Узбекистан» Продолжительность: Ноябрь 2009 – декабрь 2013 гг. (4 года) Цели и задачи: Усовершенствование управления водными ресурсами в пилотных АВП Получатели выгод от реализации проекта: водопотребители 6 пилотных АВП Структура, ответственная за реализацию проекта: Министерство сельского хозяйства и водных ресурсов Республики Узбекистан (Минсельводхоз РУз). Донор: Правительство Японии. |
|
Funding source | Ministry of Reclamation and Water Management of the USSR | Кредит Правительства Японии (Японское агентство по международному сотрудничеству), а также госбюджетные средства Минсельводхоза |
Information sources | Reshetkina N.M. et al. “Vertical Drainage”, Moscow: Kolos, 1978. – 319 p. |
1) Совместный итоговый отчет об оценке «Проекта по совершенствованию управления водными ресурсами в Республике Узбекистан», 2013г; 2) Эргашев Икрам, тел. +998-(или 0-5) 93-513-28-84 |
Contacts of a person, who filled this form | SIC ICWC |
ФИО: Мирзаев Н. Телефон: +998-90-980-26-82 Электронный адрес: mirzaevicwc@gmail.com |
Form submission date | 26.03.2018 | 26.08.2018 |