Название практики | Land reclamation via vertical drainage wells | Increasing water supply of Aksa-Ayuliye District |
---|---|---|
Category | Water resources | Water resources |
Tool | Collector-drainage system | System for enhancing water availability |
Field of application | • Use of water resources |
Use of water resources |
Usability of practice for adaptation to climate change | Moderate | Moderate |
Implemented by | Ministry of Reclamation and Water Management of the Republic of Kazakhstan |
UNDP, UNECE and Water Resources Committee of the Ministry of Agriculture of the RK jointly with the Public Association “Association of Country Farms of Shet Dis-trict of Karaganda Region” |
Used by |
Country: Kazakhstan Province: South Kazakhstan Region District: Maktaaral District |
Country: Kazakhstan Province: Karaganda Region District: Shet District Other settlement: Aksa-Ayuliye Rural District |
Local specifics | • Upstream (Ferghana) and midstream (Syr Darya) of the Syr Darya River |
The site is located in the area of acute shortage of irrigation and drinking water |
Practice usage period |
Start date: 01.01.1965 End date: 31.12.1975 |
Start date: 01.01.2015 End date: 31.12.2015 |
Problem solved through this practice | Deterioration of reclamation situation: rising of ground water, land salination |
Acute shortage of irrigation water |
Tools used in the practice | Technique and technology of land reclamation via a system of vertical drainage wells (VDW) |
Measures to restore natural springs: arrangement of stone protection fencing around springs and installation of water-release pipes |
Description of the practice and its results | Actions: A VDW system set up. Prior to its installation, the area was drained via a horizontal open-type drain-age network ineffective as to reducing the mass of salinized land. Comprehensive VDW efforts significantly enhanced drainage.
Results: Financial and economic: Technical: |
Actions Results Technical |
Lessons learnt and recommendations made | Lessons learnt: In due time, the model proved useful and timely, as the country urgently needed to increase its cotton yields. The practice demonstrated high efficiency of VDW in combatting land salination. Recommendations: 1. Establish a special VDW System Maintenance and Operation Department; |
Lessons learnt: Recommendations: |
Source of practice | Domestic tools (outcomes of research by domestic R&D organizations) |
Domestic tools (outcomes of research by domestic R&D organizations) |
Readiness for implementation |
1. Cost of implementation: Moderate 2. Approximate cost of investment per 1 ha: 3. O&M costs: High 4. Expert support: Not needed |
1. Cost of implementation: High 2. Approximate cost of investment per 1 ha: 3. O&M costs: High 4. Expert support: Not needed |
Brief information on the project | Project title: SaveH2Okz Project within the framework of the joint EU/UNDP/UNECE Project “Supporting Kazakhstan in its transition to green economy model” Duration: 2015-2018 Project goal and objectives: raising awareness on the issue of water resources exhaustion with the aim of fostering “green economy” practices Project beneficiaries: local population Project implementer: Ministry of Agriculture of the Republic of Kazakhstan |
|
Funding source | Ministry of Reclamation and Water Management of the USSR | European Union (grant) |
Information sources | Reshetkina N.M. et al. “Vertical Drainage”, Moscow: Kolos, 1978. – 319 p. |
Joint EU/UNDP/UNECE Project “Supporting Kazakhstan in its transition to green economy model” sponsored by the European Union (saveh2o.kz) |
Contacts of a person, who filled this form | SIC ICWC |
SIC ICWC |
Form submission date | 26.03.2018 | 29.03.2018 |